Hospital Lighting Conversion
San Fernando General Hospital | Trinidad and Tobago. A staged LED lighting upgrade across hospital corridors, covered access routes, and external areas.

SWRHA LED Lighting Installation - 1M TT
Electrical engineer and project manager within the contractor's team, coordinating with SWRHA technical personnel on site requirements and lighting conversion decisions — including the 150 W cobra-head substitution, the directed conversion of 4 ft fluorescent fittings, and the closing engineering report.
Client
South-West Regional Health Authority (SWRHA)
Contractor
S. Persad Contracting Services Ltd.
Period
December 2024–June 2025 record period; physical works commenced February 2025 with staged implementation.
Outcome
Photographs document energised corridor, covered-route, and exterior lighting, delivered through technical review and staged close-out.
Hospital Lighting Conversion
Energised corridors, covered routes, and exterior lighting across San Fernando General Hospital.




12kV - 2.5MVA Transformer Replacement
San Fernando General Hospital — New Wing Extension. Status: Installed and tested — not commissioned.
How the work was executed
Working with S. Persad Contracting Services Ltd., I led installation planning and coordinated the specialist activities, focusing on transformer positioning, the HV/LV interfaces, and assessment of the existing electrical infrastructure. The transformer has been installed and tested; commissioning remains outstanding. I recommended replacement of the existing switchgear after it was found unable to be racked out.
1 | Installation planning
Defined the sequence of installation and testing, including lifting arrangements, equipment inspection, LV busbar alignment, and earthing.
2 | Coordination
Coordinated transformer positioning and the HV/LV interfaces, and liaised on the work needed to progress towards commissioning.
3 | Testing
Managed specialist transformer testing — insulation resistance / polarisation index, turns ratio, winding resistance, bolted-connection resistance, and an oil sample.
4 | A critical catch
Identified the existing switchgear's inability to rack out and recommended its replacement — a limitation that must be resolved before commissioning.
Transformer Installation and Testing
Transformer positioning, HV/LV interfaces, and specialist testing.




Numbers mean little. Code compliance means more.
Years behind a panel are only useful if the work passes inspection. You'll find what we've actually done, verified, and stood behind.
1
Engineer, One Standard
100%
Code-Compliant Work
Get a straight quote for your next project
Tell us what you're building. We'll review the specs and send a clear estimate, no vague numbers. Call +12345678900 or email email@mybusiness.com.